Current:Home > CaseMeasures to obtain optimum performance

a.The belt should be placed on the conveyor with proper orientation to the direction of travel

b.Insert the threaded connector through the links(and mesh when present, insuring that the pig tail and mesh wires of the adjacent spirals alternate). Attach nut Insure that the nut does not protrude farther than the adjacent upset welds.Remove excess thread length with a hacksaw or hand grinder.

c.Using filer material recommended for type 304 or silver solder, weld upset head and nut in the same fashion as the other links and weld(or silver solder)the insides of both links attempting to achieve the same weld size and shapes as the factory weld.

d.Deburr welds to button head surface leaving no sharp edges to cut plastic drive bars(Nut and threaded should be melted smooth with a welding torch).

 

address£ºDa Qi Industrial Park of Ningjin County in Shandong ProvinceA8 Contact person£ºLujing Li The telephone£º0534-5533130 0534-5534558 Fax£º0534-5215738
Mobile phone£º13869240308 Copyright © Ningjin Haofa Chain Co.,Ltd Filing number£ºLUICPBEI12016374HAO-2 Website Design£ºJISU